OLMO782-WT808-001 is under construction
follow the build
Project Kick-off : 8th of March, 2021
Covid and its availibility and supply issues has disrupted many project plannings.
Ours as well.
Yet, the results are materialising to expectations.
Video per 16 June 2022

OLMO arrived at box builder
25 March 2021
This is where the panels will be made and box will be built.

The subframe phase 1
15 April 2021
we like a well equipped workshop. Our partner JDK has it all.



Floor
20 April 2021
Floor is build for sturdiness and stiffness - beams every 60cm


Floor and 2 walls put up
26 April 2021
Floor is laid and 2 walls are put up. First impression of size.


Box is up.
3 may 2021
rear garage, bulkheads and sides are up






Box goes on the Arocs
20 may 2021
box closed up. And on the Arocs

Ramp goes on the Arocs
4th of June 2021
and the loading ramp goes on - 1500kg capacity


Systems are moving ahead
4th of August 2021
After careful planning, the Victron Electrical Main Board is being assembled.

Interior feel defined
1st September 2021
Fabrics have been chosen

Interior progressing
4 november 2021
interior really showing its volumes and general feel


Water systems almost done
4 januari 2022
Everything its own place. Every circuit its own tap. 40L boiler tightly done
Windows are in
11 januari 2022
Windows fitted. Looking good!

At the paint shop
11 Februari 2022
Paint scheme and chassis storage being done




Victron wall done
19 April 2022
Victron wall in its place and done!


001 is alive!
11th May 2022
All is connected!

final touches
1 June 2022
coming together as envisioned!



Storage
6 June 2022
Clean and efficient. Organised and uncluttered storage. No filter Systems, no electrical equipment. Loads of storage



Box done!
20 June 2022
box is closed . all hatches in and done!